- Version
- Download 4
- File Size 163.58 KB
- File Count 1
- Create Date March 9, 2022
- Last Updated March 9, 2022
D5.1 GLOMICAVE Big Data platform architecture & integration environment up & running - Executive Summary
The current document provides a companion guide to a fully functional prototype of the GLOMICAVE platform, as part of deliverable D5.1. The content of this document is the result of several rounds of interaction between the technical partners and the end users from the GLOMICAVE consortium. The deliverable provides the first version of the architecture of the whole GLOMICAVE technical ecosystem. A second, more detailed version of the platform will be provided in D5.5, due for M42.
The following sections have included:
▪ Section 2: description of the development environment.
▪ Section 3: description of the integration environment.
▪ Section 4: conclusions and future work.
As a result, an MVP of the GLOMICAVE platform has been made available for the consortium. The result of the work carried out in it and the users’ feedback will be fed into the next iterations of the platform.